House Bill 143 (AS PASSED HOUSE AND SENATE)
By: Representatives Dickey of the 134th, Smith of the 70th, Yearta of the 152nd, Greene of the
154th, Cannon of the 172nd, and others
A BILL TO BE ENTITLED
AN ACT
To amend Chapter 5 of Title 12 of the Official Code of Georgia Annotated, relating to water
resources, so as to revise provisions regarding water-measuring devices for farm use of
surface and ground water; to provide for related matters; to repeal conflicting laws; and for
other purposes.
BE IT ENACTED BY THE GENERAL ASSEMBLY OF GEORGIA:
SECTION 1.
Chapter 5 of Title 12 of the Official Code of Georgia Annotated, relating to water resources,
is amended by revising paragraph (3) of subsection (b) and subsection (m.1) of Code
Section 12-5-31, relating to regulated riparian rights to surface waters for general or farm
use, permits for withdrawal, diversion, or impoundment, coordination with water plans,
metering of farm use, interbasin transfers, and appeal procedures, as follows:
"(3)(A) Notwithstanding any other provision of this Code section to the contrary, a
permit for the withdrawal or diversion of surface waters for farm uses shall be issued
by the director to any person when the applicant submits an application which provides
reasonable proof that the applicant's farm use of surface waters occurred prior to
July 1, 1988, and when any such application is submitted prior to July 1, 1991. If
submitted prior to July 1, 1991, an application for a permit to be issued based upon
farm uses of surface waters occurring prior to July 1, 1988, shall be granted for the
withdrawal or diversion of surface waters at a rate of withdrawal or diversion equal to
the greater of the operating capacity in place for withdrawal or diversion on
July 1, 1988, or, when measured in gallons per day on a monthly average for a calendar
year, the greatest withdrawal or diversion capacity during the five-year period
immediately preceding July 1, 1988. If submitted after July 1, 1991, or, regardless of
when submitted, if it is based upon a withdrawal or diversion of surface waters for farm
uses occurring or proposed to occur on or after July 1, 1988, an application shall be
subject to evaluation and classification pursuant to subsections (e), (f), and (g) of this
Code section, but a permit based upon such evaluation and classification shall be issued
to ensure the applicant's right to a reasonable use of such surface waters. Any permit
issued pursuant to this paragraph shall be conditioned upon the requirement that the
permittee shall provide, on forms prescribed by the director, information relating to a
general description of the lands and number of acres subject to irrigation and the
permit; a description of the general type of irrigation system used; the source of
withdrawal water such as river, stream, or impoundment; and pump information,
including rated capacity, pump location, and power information.
(B) Permits applied for under this paragraph on or after April 20, 2006, for farm use
in the Flint River basin shall have a term of 25 years and shall be automatically
renewed at the original permitted capacity unless an evaluation by the division indicates
that renewal at the original capacity would have unreasonable adverse effects upon
other water uses. The division may renew the original permit at a lower capacity, but
such capacity shall be based on the reasonable use of the permittee and evaluation of
the resource.
(C) A permittee may apply to have a permit issued under this paragraph modified,
amended, transferred, or assigned to subsequent owners of the lands which are the
subject of such permit; provided, however, that:
(i) The division shall receive written notice of any such transfer or assignment;
(ii) Any modification in or amendment to the use or capacity conditions contained
in the permit or in the lands which are the subject of such permit shall require the
permittee to submit an application for review and approval by the director consistent
with this Code section; and
(iii) The permittee may commence withdrawing water under the modified, amended,
transferred, or assigned permit on the effective date stated on the revised permit for
farm use; and
(iv) For all permits for which such modification, amendment, transfer, or assignment
is effective on or after April 20, 2018, and for which no water-measuring device is
installed, the permittee shall have one year from the updated effective date stated on
the revised permit for farm use to have an acceptable type of water-measuring device
installed, to have such device in operation at each point of permitted withdrawal, and
to notify the division in writing once the installation has occurred. The division shall
approve or disapprove the installation within 60 days of the date of notification. The
permittee shall be responsible for all associated costs.
(D) Nothing in this paragraph shall be construed as a repeal or modification of Code
Section 12-5-46."
"(m.1)(1) The division shall have the duty of implementing a program of measuring farm
uses of water in order to obtain clear and accurate information on the patterns and
amounts of such use, which information is essential to proper management of water
resources by the state and useful to farmers for improving the efficiency and effectiveness
of their use of water, meeting the requirements of subsections (b) and (m) of this Code
section, and improving water conservation.
(2) The division:
(A) May conduct its duties with division staff and may contract with other persons to
conduct any of its duties;
(B) May receive and use state appropriations, gifts, grants, or other sources of funding
to carry out its duties;
(C) Shall develop a priority system for the installation of devices for measurement of
farm uses of water at the points of those withdrawals for which a permit was issued as
of July 1, 2003. The division may refine the priority system from time to time based
on the amount of funding received by the division, considerations regarding cost
effectiveness, new technical information, changes in resource use or conditions, or
other factors as deemed relevant by the director;
(D) Shall, on behalf of the state, contract for the purchase and installation of that subset
of water-measuring devices according to the priority system required by this Code
section, and no charge shall be made to the permittee for such costs. However, when
the division assesses the site or attempts to install such water-measuring devices and
finds that the site lacks withdrawal or irrigation infrastructure, the division shall
document such withdrawal or irrigation infrastructure conditions and notify the
permittee in writing that a state funded water-measuring device or devices could not be
installed and that a device or devices are still required. After the expiration of five
years, such permittee shall be responsible for having an acceptable type of
water-measuring device installed and placed into operation and all associated costs.
The permittee shall notify the division in writing once the installation has occurred.
The division shall approve or disapprove the installation within 60 days of the date of
notification If no contractor is available, the division may use trained and certified staff
to perform installations, and no charge shall be made to the permittee for such costs;
(E) Shall, at monthly intervals, read an appropriate proportion of water-measuring
devices installed for measuring farm use of surface water and compile the collected data
for use in meeting the purposes in paragraph (1) of this subsection, and the division
shall communicate in advance with private property owners to establish reasonable
times for such readings. In the event that a permittee's water-measuring devices are
selected for monthly readings, the permittee may choose to perform those readings and
transmit that information to the division; and
(F) Shall issue an annual progress report on the status of water-measuring device
installation.
(3) Any person whose permit for agricultural water use was issued before July 1, 2003,
and who desires to install a water-measuring device at no cost to the state may do so,
provided that the permittee shall have an acceptable type of water-measuring device
installed and placed in operation at each point of permitted withdrawal and the permittee
shall notify the division in writing once the installation has occurred. The division shall
approve or disapprove the installation within 60 days of the date of notification.
(4) Any person who desires to commence a farm use of water for which a permit is
issued after July 1, 2003, shall not commence such use prior to receiving approval from
the division that such person has installed an acceptable type of water-measuring device
installed by the commission at each point of permitted withdrawal. The permittee shall
be responsible for all such costs.
(5) Employees, contractors, or agents of the division are authorized to enter upon private
property at reasonable times and upon reasonable notice to conduct the duties of the
division under this subsection.
(6) Regarding all permits for which a water-measuring device is installed, regardless of
when the permit was issued, the division shall contract for the annual reading of such
water-measuring devices. The division shall require each contractor conducting such
annual readings to transmit complete and accurate data required by the division to the
division annually.
(7) The division shall audit a subset of reported water-measuring device readings
submitted by permittees for the purpose of understanding and improving the accuracy of
such readings.
(8) The division shall contract for any maintenance, repair, or replacement of
water-measuring devices installed pursuant to this Code section where maintenance,
repair, or replacement is required to ensure that such water-measuring devices accurately
reflect the amount of water used, and no charge shall be made to the permittee for such
costs. The division shall also have the authority to undertake repairs or replacements of
water-measuring devices when such repairs or replacements are necessary to maintain
compliance with water use regulations, and no charge shall be made to the permittee for
such costs.
(9) If the division determines that the permittee or the permittee's employees, tenants,
licensees, or agents have willfully dismantled, sold, relocated, or removed any
water-measuring device installed pursuant to this Code section, the permittee may be
subject to enforcement action by the division, including but not limited to imposition of
civil penalties.
(10) Any reports of amounts of use for recreational purposes under this Code section
shall be compiled separately from amounts reported for all other farm uses."
SECTION 2.
Said chapter is further amended by revising subsections (b) and (b.1) of Code
Section 12-5-105, relating to regulated reasonable use of ground water for farm use, permits
to withdraw, obtain, or utilize, metering, and related procedures, as follows:
"(b) Notwithstanding any provisions of Code Section 12-5-95, 12-5-96, or 12-5-97 to the
contrary, permits to withdraw, obtain, or utilize ground waters for farm uses, as that term
is defined in paragraph (5.1) of Code Section 12-5-92, whether for new withdrawals or
under subsection (a) of this Code section, shall be governed as follows:
(1) Permits applied for under this Code section on or after April 20, 2006, for farm use
within the Flint River basin shall have a term of 25 years and shall be automatically
renewed at the original permitted capacity unless an evaluation by the division indicates
that renewal at the original capacity would have unreasonable adverse effects upon other
water uses. The division may renew the original permit at a lower capacity, but such
capacity shall be based on the reasonable use of the permittee and evaluation of the
resource;
(2) A permittee may apply to have a permit issued under this Code section modified,
amended, transferred, or assigned to subsequent owners of the lands which are the subject
of such permit; provided, however, that:
(A) The division shall receive written notice of any such transfer or assignment;
(B) Any modification in or amendment to the use or capacity conditions contained in
the permit or in the lands which are the subject of such permit shall require the
permittee to submit an application for review and approval by the director consistent
with the requirements of this part; and
(C) The permittee may commence withdrawing water under the modified, amended,
transferred, or assigned permit on the effective date stated on the revised permit for
farm use; and
(D) For all permits for which such modification, amendment, transfer, or assignment
is effective on or after April 20, 2018, and for which no water-measuring device is
installed, the permittee shall have one year from the updated effective date stated on the
revised permit for farm use to have an acceptable type of water-measuring device
installed, to have such device in operation at each point of permitted withdrawal, and
to notify the division in writing once the installation has occurred. The division shall
approve or disapprove the installation within 60 days of the date of notification. The
permittee shall be responsible for all associated costs;
(3) Permits for farm use, after initial use has commenced, shall not be revoked, in whole
or in part, for nonuse; except that the director may permanently revoke any permit under
this Code section for farm use within the Flint River Basin applied for on or after
April 20, 2006, if initial use for the purpose indicated on the permit application, as
measured by a flow meter approved by the division has not commenced within two years
of the date of issuance of the permit unless the permittee can reasonably demonstrate that
his or her nonuse was due to financial hardship or circumstances beyond his or her
control;
(4) The director may suspend or modify a permit for farm use if he or she should
determine through inspection, investigations, or otherwise that the quantity of water
allowed would prevent other applicants from reasonable use of ground water beneath
their property for farm use;
(5) During emergency periods of water shortage, the director shall give first priority to
providing water for human consumption and second priority to farm use; and
(6) The importance and necessity of water for industrial purposes are in no way modified
or diminished by this Code section.
(b.1)(1) The division shall have the duty of implementing a program of measuring farm
uses of water in order to obtain clear and accurate information on the patterns and
amounts of such use, which information is essential to proper management of water
resources by the state and useful to farmers for improving the efficiency and effectiveness
of their use of water, meeting the requirements of subsections (b) and (b.1) of this Code
section, and improving water conservation.
(2) The division:
(A) May conduct its duties with division staff and may contract with other persons to
conduct any of its duties;
(B) May receive and use state appropriations, gifts, grants, or other sources of funding
to carry out its duties;
(C) Shall develop a priority system for the installation of devices for measurement of
farm uses of water at the points of those withdrawals for which a permit was issued as
of July 1, 2003. The division may refine the priority system from time to time based
on the amount of funding received by the division, considerations regarding cost
effectiveness, new technical information, changes in resource use or conditions, or
other factors as deemed relevant by the director;
(D) Shall, on behalf of the state, contract for the purchase and installation of that subset
of water-measuring devices according to the priority system required by this Code
section, and no charge shall be made to the permittee for such costs. However, when
the division assesses the site or attempts to install such water-measuring devices and
finds that the site lacks the withdrawal or irrigation infrastructure, the division shall
document such withdrawal or irrigation infrastructure conditions and notify the
permittee in writing that a state funded water-measuring device or devices could not be
installed and that a device or devices are still required. After the expiration of five
years, such permittee shall be responsible for having an acceptable type of
water-measuring device installed and placed into operation and all associated costs.
The permittee shall notify the division in writing once the installation has occurred.
The division shall approve or disapprove the installation within 60 days of the date of
notification If no contractor is available, the division may use trained and certified staff
to perform installations, and no charge shall be made to the permittee for such costs;
(E) Shall, at monthly intervals, read an appropriate proportion of water-measuring
devices installed for measuring farm use of ground water and compile the collected data
for use in meeting the purposes in paragraph (1) of this Code section, and the division
shall communicate in advance with private property owners to establish reasonable
times for such readings. In the event that a permittee's water-measuring devices are
selected for monthly readings, the permittee may choose to perform those readings and
transmit that information to the division; and
(F) Shall issue an annual progress report on the status of water-measuring device
installation.
(3) Any person whose permit for agricultural water use was issued before July 1, 2003,
and who desires to install a water-measuring device at no cost to the state may do so,
provided that the permittee shall have an acceptable type of water-measuring device
installed and placed in operation at each point of permitted withdrawal and the permittee
shall notify the division in writing once the installation has occurred. The division shall
approve or disapprove the installation within 60 days of the date of notification.
(4) Any person who desires to commence a farm use of water for which a permit is
issued after July 1, 2003, shall not commence such use prior to receiving approval from
the division that such person has installed an acceptable type of water-measuring device
installed by the commission at each point of permitted withdrawal. The permittee shall
be responsible for all such costs.
(5) Regarding all permits for which a water-measuring device is installed, regardless of
when the permit was issued, the division shall contract for the annual reading of such
water-measuring devices. The division shall require each contractor conducting such
annual readings to transmit complete and accurate data required by the division to the
division annually.
(6) The division shall audit a subset of reported water-measuring device readings
submitted by permittees for the purpose of understanding and improving the accuracy of
such readings.
(7) Employees, contractors, or agents of the division are authorized to enter upon private
property at reasonable times and upon reasonable notice to conduct the duties of the
division under this subsection.
(8) The division shall contract for any maintenance, repair, or replacement of
water-measuring devices installed pursuant to this Code section where maintenance,
repair, or replacement is required to ensure that such water-measuring devices accurately
reflect the amount of water used, and no charge shall be made to the permittee for such
costs. The division shall also have the authority to undertake repairs or replacements of
water-measuring devices when such repairs or replacements are necessary to maintain
compliance with water use regulations, and no charge shall be made to the permittee for
such costs.
(9) If the division determines that the permittee or the permittee's employees, tenants,
licensees, or agents have willfully dismantled, sold, relocated, or removed any
water-measuring device installed pursuant to this Code section, the permittee may be
subject to enforcement action by the division, including but not limited to imposition of
civil penalties.
(10) Any reports of amounts of use for recreational purposes under this part shall be
compiled separately from amounts reported for all other farm uses.
(c) Nothing in this Code section shall be construed as a repeal or modification of Code
Section 12-5-104."
SECTION 3.
All laws and parts of laws in conflict with this Act are repealed.