Skip to content
Georgia Commons
Menu

Amendment

Floor Amend 1 AM 56 0043 to SB 34

Type
Amendment
Cite as
SB 34, Floor Amend 1 AM 56 0043
Date
September 25, 2026
Session
2025-2026
License
Public record of the Georgia General Assembly, from its website (legis.ga.gov)

Machine-readable https://georgiacommons.org/bills/2025-2026/sb34/amendments/244382.md · https://georgiacommons.org/index.md · MCP https://mcp.georgiacommons.org/mcp

The text

Senators Hufstetler of the 52nd, Albers of the 56th, Hickman of the 4th, Setzler of the 37th, Hatchett of the 50th, and others offered the following amendment #1: Amend the Senate Committee on Regulated Industries and Utilities substitute to SB 34 (LC 56 0584S) by replacing line 2 with the following: Public Service Commission, so as to prohibit certain costs incurred by an electric utility from being included in certain rates; to require certain contract terms and conditions between By replacing line 13 with the following: (b) Notwithstanding the provisions of Code Section 46-3-11, no costs incurred by an electric utility, including, but not limited to, costs associated with increased fuel requirements, generation costs, and transmission costs that are related to the provision of electric services to large load customers and would not have been incurred but for the electric demand of such large load customers, shall be included in any rates or charges allowed to go into effect under Code Section 46-2-25 or 46-2-26 unless such rates or charges are designed to substantially recover such costs from such large load customers. (c) Each contract between an electric utility and a large load customer for the provision

Versions

  1. Floor Amend 1 AM 56 0043September 25, 2026currentamendment:2025-2026/sb34/244382@244382

Answers are written by AI from this document, and every quotation is checked against it. Not legal advice.