(a) Demolition of any structure shall not begin until all utilities are cut off and capped at the street. (b) All debris, trash, litter, rubbish, rubble, and foundation exposed above the ground level shall be removed from the premises. (c) Any excavation or other depression must be filled to existing grade with clean dirt containing no more than twenty-five (25) percent stone or masonry and all filled areas must be adequately sloped and drained.