--- title: Dawson Code of Ordinances, Sec. 12-23. Private sewage disposal collection: local-codes id: local-code:dawson/code/12-23 cite_as: Dawson, Ga., Code of Ordinances § 12-23 canonical_url: https://georgiacommons.org/cities/dawson/code/12-23 md_url: https://georgiacommons.org/cities/dawson/code/12-23.md text_url: https://georgiacommons.org/cities/dawson/code/12-23/text source_url: https://library.municode.com/ga/dawson/codes/code_of_ordinances date: 2026-11-14 status: active jurisdiction: city:dawson jurisdiction_name: Dawson place_fips: "1321912" corpus_version: local-codes-dawson-ee593c4c6316 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/cities/dawson/code/~chapter-12/~article-ii/~division-1.md previous: https://georgiacommons.org/cities/dawson/code/12-22.md next: https://georgiacommons.org/cities/dawson/code/12-24.md index: https://georgiacommons.org/cities/dawson.md branch: code edition: As published by Municode, retrieved 2026-11-14 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:dawson/code/12-23@2026-11-14-a1bbb8e091 --- # Dawson Code of Ordinances, Sec. 12-23. Private sewage disposal > As published by Municode, retrieved 2026-11-14 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Chapter 12 - MUNICIPAL UTILITIES AND SERVICES / Article II - SEWER USE / Division 1 - GENERALLY (a) Where a public sanitary sewer is not available, under the provisions of section 12-22, or where industrial or commercial wastes are excluded, the building sewer shall be connected to a private sewage disposal system complying with the provisions of this article. (b) Before commencement of construction of a private sewage disposal system, the owner shall first obtain a written permit from the city. The application for such permit shall be made on a form furnished by the city, which the applicant shall supplement by any plans, specifications, and other information as are deemed necessary by the superintendent. A permit and inspection fee as prescribed by the council from time to time shall be paid to the city at the time the application is filed. (c) A permit for a private sewage disposal system shall not become effective until the installation is complete to the satisfaction of the superintendent. The superintendent shall be allowed to inspect the work at any stage of construction and, in any event, the applicant for the permit shall notify the superintendent when the work is ready for final inspection, and before any underground portions are covered. The inspections shall be made within twenty-four (24) hours of the receipt of notice by the sewer commission. (d) The type, capacities, location, and layout of a private sewage disposal system shall comply with all requirements of the state department of natural resources, environmental protection division (EPD), and obtain the approval of the state EPD prior to a permit being issued. No permit shall be issued for any private sewage disposal system employing sub-surface soil absorption facilities where the area of the lot is less than twenty-thousand (20,000) square feet. No septic tank or cesspool shall be permitted to discharge to any natural outlet. (e) Each developer or subdivider shall be required to install or have installed, at such person's expense and throughout the entire development or subdivision, sanitary sewer lines, manholes and building sewers. All such facilities shall comply with all provisions of this article and, with the exception of the building sewer, shall become the property of the city when such facilities are connected to the public sewer. (f) At such time as a public sewer becomes available to a property served by a private sewage disposal system, as provided in subsection (d) of this section, a direct connection shall be made to the public sewer in compliance with this article, and any septic tanks, cesspools, and similar private sewage disposal facilities shall be abandoned and filled with suitable material. (g) The owner shall operate and maintain the private sewerage disposal facilities at all times, at no expense to the city. (h) No statement contained in this article shall be construed to interfere with any additional requirements that may be imposed by local, state or federal agencies having authority to impose such requirements. (i) When a public sewer becomes available, the building sewer shall be connected to such sewer within sixty (60) days and the private sewage disposal system shall be cleaned of sludge and filled with clean bank-run dirt or gravel. ## History (Code 1974, § 21-104)