(a) The admission into the public sewers of any waters or wastes having: (1) A five (5) day biochemical oxygen demand greater than three hundred (300) milligrams per liter by weight, or (2) Containing more than three hundred fifty (350) milligrams per liter by weight of suspended solids, or (3) Containing any quantity of substances having the characteristics described in section 12-31(b), or (4) Having an average daily flow greater than two (2) percent of the average daily sewage flow of the sewer system, shall be subject to the review and approval of the city. (b) Where necessary in the opinion of the city, the owner shall provide, at the owner's expense such preliminary treatment as may be necessary to: (1) Reduce the biochemical oxygen demand to three hundred (300) milligrams per liter and the suspended solids to three hundred (300) milligrams per liter by weight, or (2) Reduce objectionable characteristics of constituents to within the maximum limits provided for in this division, or (3) Control the quantities and rates of discharge of such waters or wastes. (c) Plans, specifications and any other pertinent information relating to proposed preliminary treatment facilities shall be submitted for the approval of the city together with a letter from the city engineer approving the proposed preliminary treatment facilities and no construction of such facilities shall be commenced until such approvals are obtained in writing.