All measurements, tests, and analyses of the characteristics of waters and wastes to which reference is made in subsection (b) of section 12-31 and section 12-34, shall be determined in accordance with "Standard Methods for the Examination of Water and Sewerage" or with methods approved by the city engineer and may be determined at the control manhole provided for in section 12-36, or upon suitable samples taken at such manhole. In the event that no special manhole has been required, the control manhole may be considered to be the nearest downstream manhole to the public sewer to the point at which the building sewer is connected. If, in the judgment of the superintendent, analyses must be performed which are beyond the scope of the laboratory at the sewerage treatment plant, these analyses shall be performed at a laboratory designated by the superintendent and the cost of these analyses shall be borne by the owner.