(a) A grantee shall extend the installation of cables, amplifiers, and related equipment throughout the area covered by its franchise as rapidly as practicable but, in any event, shall: (1) Begin engineering studies within thirty (30) days after accepting its franchise. (2) Begin awarding contracts within one hundred eighty (180) days after receiving certification from the FCC. (3) Begin construction of its proposed system within six (6) months after receiving certification from the FCC. (4) Begin rendering service to subscribers within one (1) year after receiving certification from the FCC. (5) Complete construction of forty (40) percent of its proposed system (measured in terms of total linear strand miles) within two (2) years after receiving certification from the FCC, and complete an additional twenty (20) percent each year thereafter so that after five (5) years the entire system shall be substantially constructed and the grantee capable of providing service not more than sixty (60) days after receiving an application for service to every dwelling unit within the franchise area except to the extent that density of homes, adverse terrain, or other factors render making service available impracticable. For the purposes of determining compliance with the provisions of this subparagraph, and to provide for a reasonable policy requiring extension of energized truck lines of the cable system within the franchise area so as to achieve compliance with the obligations imposed by this section, grantee shall extend such lines to all areas of the franchise area having a minimum of fifty (50) homes per street mile. (b) Failure on the part of a grantee to commence and diligently pursue each of the foregoing requirements and to complete each of the matters set forth herein, shall be grounds for termination of its franchise pursuant to the terms of section 13-52(b) and section 13-53(b); provided, however, that the franchise authority may in its discretion extend the time for the commencement and completion of construction and installation for additional periods in the event the grantee, acting in good faith, experiences delays by reasons of circumstances beyond its control. (c) In the event the operation of any part of a cable television system is discontinued for a continuous period of twelve (12) months, or in the event such system has been installed in any public street without complying with the requirements of the grantee's franchise, the grantee shall promptly, upon being given ten (10) days' notice, remove from the streets or public places all such property and poles of such system. Any property which the grantee allows to remain in place sixty (60) days after having been notified by the franchise entity that it must be removed shall be considered permanently abandoned and shall become the property of the franchise entity subject to the provisions of any utility joint use attachment agreement. (d) Upon the failure of a grantee to satisfactorily complete any work upon the public streets as may be required by law or the term of its franchise within the time prescribed, the franchise entity, at its option, may cause such work to be done and the grantee shall pay to the franchise entity the cost thereof within thirty (30) days after receipt of an itemized report.