Dawson · Code of Ordinances
Chapter 5 - BUILDINGS; CONSTRUCTION AND RELATED ACTIVITIES / Article II - UNDERGROUND UTILITY PROTECTION
Sec. 5-23. Notice of intent to excavate or demolish.
About this text
- As published by Municode, retrieved 2026-11-14
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) Except as provided in section 5-25, before commencing any excavation or demolition operation designated in section 5-22, each person responsible for such excavation or demolition shall serve upon the city telephonic notice of intent to excavate or demolish at least three (3), but not more than ten (10) full working days, before commencing such operations. The notification shall be made to the utility superintendent in the city hall.
(b) Where demolition of a building is proposed, the city shall be given reasonable time to remove or protect its utilities before demolition of the building is commenced.
(c) The written or telephonic notice required by subsection (a) of this section must contain the name, address, and telephone number of the person filing the notice of intent, and, if different, the person responsible for the excavation or demolition, the starting date, anticipated duration, and type of excavation or demolition operation to be conducted, the location of the proposed excavation or demolition, and whether or not explosives are to be used.
(d) If the notification required by this section is made by telephone, an adequate record of such notification shall be maintained by the city clerk.
History
(Ord. of 4-1-83, § 5)
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.