Sec. 5-26. Precautions to avoid damage.

About this text

  • As published by Municode, retrieved 2026-11-14
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

In addition to the notification requirements of section 5-23, each person responsible for any excavation or demolition operation designated in section 5-22 shall:

(1) Plan the excavation or demolition to avoid damage to or minimize interference with underground utilities in and near the construction area;

(2) Maintain a clearance between an underground utility and the cutting edge or point of any mechanized equipment, taking into account the known limit of control of such cutting edge or point, as may be reasonably necessary to avoid damage to such utility; and

(3) Provide such support for underground utilities in and near the construction area, including during backfill operation, as may be reasonably necessary for the protection of such utilities.

History

The history line the source prints at the end of the section.

(Ord. of 4-1-83, § 8)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:dawson/code/5-26@2026-11-14-44f9311474

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.