--- title: Forsyth Code of Ordinances, Sec. 10-11. Construction stage submittal requirements collection: local-codes id: local-code:forsyth/code/10-11 cite_as: Forsyth, Ga., Code of Ordinances § 10-11 canonical_url: https://georgiacommons.org/cities/forsyth/code/10-11 md_url: https://georgiacommons.org/cities/forsyth/code/10-11.md text_url: https://georgiacommons.org/cities/forsyth/code/10-11/text source_url: https://www.cityofforsyth.net/sites/default/files/uploads/code-of-ordinances/chapter-10-environment.pdf date: 2026-11-11 status: active jurisdiction: city:forsyth jurisdiction_name: Forsyth place_fips: "1330732" corpus_version: local-codes-forsyth-9710e5e3d8ee publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/cities/forsyth/code/~chapter-10/~article-i/~division-i.md previous: https://georgiacommons.org/cities/forsyth/code/10-10.md next: https://georgiacommons.org/cities/forsyth/code/10-12.md index: https://georgiacommons.org/cities/forsyth.md branch: code edition: As posted on the city's website, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: city website version_id: local-code:forsyth/code/10-11@2026-11-11-b4578868b4 --- # Forsyth Code of Ordinances, Sec. 10-11. Construction stage submittal requirements > As posted on the city's website, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Chapter 10 - ENVIRONMENT / Article I - FLOOD DAMAGE PREVENTION / Division I - GENERALLY For all new construction and substantial improvements on sites with a floodplain management/flood damage prevention plan, the permit holder shall provide to the City Manager a certified as-built Elevation Certificate or Floodproofing Certificate for non-residential construction including the lowest floor elevation or floodproofing level immediately after the lowest floor or floodproofing is completed. A final Elevation Certificate shall be provided after completion of construction including final grading of the site. Any lowest floor certification made relative to mean sea level shall be prepared by or under the direct supervision of a licensed land surveyor or professional engineer and certified by same. When floodproofing is utilized for non-residential structures, said certification shall be prepared by or under the direct supervision of a licensed professional engineer or architect, and certified by same using the FEMA Floodproofing Certificate. This certification shall also include the design and operation/maintenance plan to assure continued viability of the floodproofing measures. Any work undertaken prior to approval of these certifications shall be at the permit holder’s risk. The City Manager shall review the above referenced certification data submitted. Deficiencies detected by such review shall be corrected by the permit holder immediately and prior to further work being allowed to proceed. Failure to submit certification or failure to make the corrections required hereby shall be cause to issue a stop work order for the project.