(a) It shall be the duty of an owner intending to develop land for residential, commercial, and industrial purposes to prepare and submit a stormwater management plan to the City Manager, or his or her designee for approval prior to engaging in any land-disturbing activities on parcels 1/3 acre or larger in size. Such plan shall be held to reasonable technical design, and inspection regulations in keeping with best practices in construction and engineering. Such plan must be prepared by a professional engineer or a land surveyor licensed by the State of Georgia who will certify that the design meets minimum standards (≤ 1%) and will serve the intended purpose. Any liability associated with the performance and operation of the facility will remain with the designer and owner into perpetuity as designed. The city assumes no liability due to or associated with the design of any stormwater drainage facility. (b) Any person aggrieved or affected by any decision of the City Manager, or his or her designee regarding the approval or disapproval of a stormwater management plan may make an appeal, as provided for in the regulations of the city.