(a) New construction, and the repair or renovation of an existing building, shall be exempt from the requirements of Section 23-142 when: (1) The repair or renovation of the existing building does not include the replacement of the plumbing or sewage system servicing toilets, faucets or showerheads within such existing buildings; or (2) When such plumbing or sewage system within such existing building, because of its capacity, design, or installation would not function properly if the toilets, faucets or showerheads required by this ordinance were installed; or (3) Such system is a well or gravity flow from a spring and is privately owned by an individual for use in such individual’s personal residence; or (4) Units to be installed are: a. Specifically designed for use by the handicapped, b. Specifically designed to withstand unusual abuse or installation in a penal institution; or c. Toilets for juveniles. (b) The owner, or his agent of a building undergoing new construction or repair or renovation who is entitled to an exemption as specified in subparagraph (a)(2), (3) or (4) of this section shall obtain the exemption by applying for a permit from the City Manager, or his or her designee. The fee for such permit shall be set by City Council by resolution.