(a) All underground electric services must be in conduit. The conduit shall be UL listed electrical grade schedule 40 PVC with pull string. Water pipe is not acceptable. Conduit size shall be 2.5 inches for services up to 225 amps. For all other services the City Electric Dept. will specify the size and number of conduits. (b) The customer/contractor is required to furnish and install the service conduit. Final grade shall be established prior to the installation. The installed final depth shall in no case be less than 24 inches to the top of the conduit. (c) Meter base location and route of conduit shall be approved by the City Electric Dept. prior to installation. Under no circumstances shall the customer/contractor install service conduit until the route has been approved. (d) Services under 125 feet shall have a maximum of 270 degrees of conduit bend and all 90-degree bends must have a minimum 24-inch radius. (e) Services exceeding 125 feet must be installed in a straight line to the service point or have a service pedestal. The City Electric Dept. shall determine the location and quantity of service pedestals if needed.