Jasper · Code of Ordinances
Part II - CODE OF ORDINANCES / Chapter 18 - BUILDINGS AND BUILDING REGULATIONS / Article IV - BUILDING PERMITS AND CERTIFICATES / Division 2 - DRAWINGS AND SPECIFICATIONS
Sec. 18-114. Requirements.
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
When required by the building official, two or more copies of specifications, and drawings, to scale, with sufficient clarity and detail to indicate the nature and character of the work, shall accompany the application for permit. Such drawings and specifications shall contain information, in the form of notes or otherwise, as to the quality of materials, where quality is essential to conformity with the technical codes.
Such information shall be specific, and the technical codes shall not be cited, in whole or in part, nor shall the term legal or its equivalent be used, as a substitute for specific information. All information, drawings, specifications and accompanying data shall bear the name and signature of the person responsible for the design.
History
(Code 1979, § 42-3.2.1)
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.