Sec. 18-257. Required.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

A new building shall not be occupied or a change made in the occupancy, nature or use of a building or part of a building until after the building official has issued a certificate of occupancy. The certificate shall not be issued until all required electrical, gas, mechanical, plumbing and fire protection systems have been inspected for compliance with the technical codes, this Code, state law and released by the building official.

History

The history line the source prints at the end of the section.

(Code 1979, § 42-3.9.1.1)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:jasper/code/18-257@2026-11-11-5b9586adf1

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Jasper Code of Ordinances, Sec. 18-257. Required | Georgia Commons