Skip to content
Georgia Commons
Menu

Jasper · Code of Ordinances

Part II - CODE OF ORDINANCES / Chapter 18 - BUILDINGS AND BUILDING REGULATIONS / Article IV - BUILDING PERMITS AND CERTIFICATES / Division 8 - CERTIFICATES OF OCCUPANCY AND COMPLETION

Sec. 18-260. Existing buildings.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

A certificate of occupancy for any existing building may be obtained by applying to the building official and supplying the information and data necessary to determine compliance with the technical codes for the occupancy intended. Where necessary, in the opinion of the building official, two sets of detailed drawings, or a general inspection, or both, may be required. When, upon examination and inspection, it is found that the building conforms to the provisions of the technical codes and other applicable laws and articles for such occupancy, a certificate of occupancy shall be issued.

History

The history line the source prints at the end of the section.

(Code 1979, § 42-3.9.1.4)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:jasper/code/18-260@2026-11-11-4d755a884d

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Jasper Code of Ordinances, Sec. 18-260. Existing buildings | Georgia Commons