(a) The permittee shall take appropriate measures to ensure that during the performance of the excavation work, traffic conditions shall be maintained at all times as nearly normal as practicable so as to cause as little inconvenience as possible to the occupants of the abutting property and to the general public, provided that the street superintendent may recommend the closing of streets to all traffic for a period of time if in his opinion it is necessary. (b) The permittee shall route and control traffic, including its own vehicles, as directed by the city police department. The following steps shall be taken before any highway may be closed or restricted to traffic: (1) The permittee must receive the approval of the street superintendent and the police department. (2) The permittee must notify the chief of the fire department of any street so closed. (c) Upon completion of construction work the permittee shall notify the street superintendent and city police department before traffic is moved back to its normal flow so that any necessary adjustments may be made. (d) Where flagmen are deemed necessary by the chief of police, they shall be furnished by the permittee at its own expense. Through traffic shall be maintained without the aid of detours, if possible. In instances in which this would not be feasible, the street superintendent will designate detours. The city shall maintain roadway surfaces of existing highways designated as detours without expense to the permittee, but in case there are not existing highways, the permittee shall construct all detours at its expense and in conformity with the specifications of the street superintendent. The permittee will be responsible for any unnecessary damage caused to any highways by the operation of its equipment.