Jasper · Code of Ordinances
Part II - CODE OF ORDINANCES / Chapter 66 - STREETS, CURBS, AND SIDEWALKS / Article V - EXCAVATIONS
Sec. 66-131. Backfilling.
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Backfilling in any street opened or excavated pursuant to an excavation permit issued hereunder shall be compacted to a degree equivalent to that of the undisturbed ground in which the trench was dug and in a manner consistent with sound engineering practices generally recognized in the construction industry.
History
(Code 1979, § 50-103.15)
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.