Jasper · Code of Ordinances
Part II - CODE OF ORDINANCES / Chapter 82 - UTILITIES / Article II - WATER / Division 4 - CROSS CONNECTIONS
Sec. 82-112. Supplying of information to determine compliance.
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
The public works director or other duly authorized agent of the city may require a user of sewer services, or water services, or both, to provide information needed to determine compliance with this chapter. These requirements may include:
(1) Wastewaters discharge peak rate and volume over a specified time period;
(2) Chemical analyses of wastewaters;
(3) Information on raw materials, processes and products affecting wastewater volume and quality;
(4) Quantity and disposition of specific liquid, sludge, oil, solvent or other materials important to sewer use control;
(5) A plot plan of sewers of the user's property showing sewer and pretreatment facility location;
(6) Details of wastewater pretreatment facilities;
(7) Details of systems to prevent and control the losses of materials through spills to the municipal sewer:
(8) Water usage;
(9) Location of water pipes, connections and apparatus.
History
(Ord. No. 2023-05, § 1, 4-4-2023)
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.