Jasper · Code of Ordinances
Part II - CODE OF ORDINANCES / Chapter 82 - UTILITIES / Article III - SEWERS / Division 2 - SEWER DISCHARGE REGULATIONS
Sec. 82-269. Industrial discharges.
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) Industrial contributors to the public sanitary sewer system shall be required to pay a sewer rate surcharge based upon the concentration of suspended solids and five-day BOD in their effluents. Industrial dischargers whose wastes contain greater than 350 mg/l of either five-day BOD and/or suspended solids and a COD of 1,000 mg/l shall pay the surcharge in an amount set by the city council.
(b) If values for five-day BOD or suspended solids exceed 350 mg/l, or if values for COD exceed 500 mg/l, then the council may, if it determines that these wastes adversely affect the operation of sewage treatment plants, require the owner to install pretreatment before he discharges wastes to the public sanitary sewer system. Such pretreatment must alter the condition of the discharge to the point where it no longer harms the operation of the sewage treatment plants and the values for both five-day BOD and suspended solids will be below 350 mg/l and values for COD will be below 1,000 mg/l.
(c) Periodic determination of the values for five-day BOD, suspended solids and COD shall be made on composite samples of industrial fluids by personnel designated by the city.
History
(Code 1979, § 21-105.7)
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.