(a) Septic tank waste may be introduced into the wastewater treatment plant at locations designated by the city and at such times as established by the city. Such waste shall not violate any section of this article. The city may require septic tank waste haulers to obtain a wastewater discharge permit. A fee for disposal of septic tank waste shall be charged according to a schedule of adopted by the mayor and council. (b) Hauled industrial waste may be introduced into the wastewater treatment plant at locations designated by the city, at such times as established by the city and after approval is granted by the city. Such waste shall not violate any section of this article. The city may require the waste hauler to obtain a wastewater discharge permit if the total daily wastewater discharged exceeds 25,000 gallons per day. The city may require the industrial waste hauler to provide a waste analysis of any load prior to discharge. The city may collect samples of each hauled load to ensure compliance with applicable standards. A fee for disposal of hauled industrial waste shall be charged according to a schedule adopted by the mayor and council.