Sec. 82-461. Same—By noncontributing consumers.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) When a property owner desires connection to the sewerage system within 25 years after construction of the sanitary sewer line, and he or a previous owner has not contributed to the cost of constructing the sanitary sewer line, he must pay to the water and wastewater department a proportionate cost of construction based on the footage his property abuts the sanitary sewer. After payment, the owner may construct a service line, pay a plumbing fee and a sewer tap fee, and, after the line has been inspected and approved, connect to the system.

(b) If the connection is desired more than 25 years after completion of the sanitary sewer main, then there is no assessment for construction costs, and only the appropriate plumbing and sewer tap fees are paid.

History

The history line the source prints at the end of the section.

(Code 1979, § 21-106.21)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:jasper/code/82-461@2026-11-11-97dec09dea

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Jasper Code of Ordinances, Sec. 82-461. Same—By noncontributing consumers | Georgia Commons