Duties of the Authority shall include, but shall not be limited to:

(1) Review proposed development to assure that the permit requirements of this ordinance have been satisfied.

(2) Advise permittee that additional federal or state permits maybe required, and if specific federal or state permit requirements are known, require that copies of such permits be provided and maintained on file with the Floodplain Development permit.

(3) Review all permit applications to determine whether proposed building sites will be reasonably safe from flooding.

(4) When base flood elevation data or floodway data have not been provided in accordance with section 11-6, then the Authority shall obtain, review and reasonably utilize any base flood elevation and floodway data available from federal, state or other sources in order to administer the flood hazard reduction provisions of Article IV.

(5) Review and record the actual elevation in NAVD 88 (or highest adjacent grade) of the lowest floor, including basement, of all new or substantially improved structures in accordance with Section 11-16(2).

(6) Review and record the actual elevation, in NAVD 88 to which any new or substantially improved structures have been flood-proofed, in accordance with Section 11-16(2).

(7) When flood-proofing is utilized for a structure, the Authority shall obtain certification of design criteria from a registered professional engineer or architect in accordance with Sections 11-16(1)(c) and Sections 11-21(2) or 11-23(2).

(8) Make substantial damage determinations following a flood event or any other event that causes damage to structures in flood hazard areas.

(9) Notify adjacent communities and the Georgia Department of Natural Resources prior to any alteration or relocation of a watercourse and submit evidence of such notification to the Federal Emergency Management Agency (FEMA).

(10) For any altered or relocated watercourse, submit engineering data/analysis within six (6) months to the FEMA to ensure accuracy of community flood maps through the Letter of Map Revision process. Assure flood carrying capacity of any altered or relocated watercourse is maintained or improved.

(11) Where interpretation is needed as to the exact location of boundaries of the Areas of Special Flood Hazard (for example, where there appears to be a conflict between a mapped boundary and actual field conditions) the Authority shall make the necessary interpretation. Any person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation as provided in this ordinance.

(12) All records pertaining to the provisions of this chapter shall be maintained in the office of the Authority and shall be open for public inspection.

(13) Whenever in this section, a verification is required by the Authority, he may rely upon a certification by an engineer or surveyor registered in the State of Georgia.

History

The history line the source prints at the end of the section.

(Ord. No. O-22-0016, § 1(Exh. A), 4-5-2022)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:macon-bibb/code/11-17@2026-11-14-8564155acd

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.