Macon-Bibb County · Code of Ordinances
Part III - CODE OF ORDINANCES / Chapter 22 - SOLID WASTE MANAGEMENT / Article III - LITTER CONTROL / Division 2 - LITTER AND DEBRIS CONTROL
Sec. 22-65. Construction site to be maintained.
About this text
- As published by Municode, retrieved 2026-11-14
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) Property owners and prime contractors in charge of a construction site are jointly and severally required to furnish litter containers for construction litter. All litter from construction and related activities shall be containerized and shall be picked up and placed in containers at the end of each work day.
(b) Rock, waste building materials, or other refuse resulting from building or remodeling operations or resulting from a general cleanup of vacant or improved property just prior to its occupancy, shall not be removed by the solid waste division. Such waste shall be removed by the building contractor, owner, or occupant of the building at his own expense.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.