--- title: Macon-Bibb County Code of Ordinances, Sec. 23-38. Compliance through Off-Site Stormwater Management Practices collection: local-codes id: local-code:macon-bibb/code/23-38 cite_as: Macon-Bibb County, Ga., Code of Ordinances § 23-38 canonical_url: https://georgiacommons.org/cities/macon-bibb/code/23-38 md_url: https://georgiacommons.org/cities/macon-bibb/code/23-38.md text_url: https://georgiacommons.org/cities/macon-bibb/code/23-38/text source_url: https://library.municode.com/ga/macon-bibb_county/codes/code_of_ordinances date: 2026-11-14 status: active jurisdiction: consolidated:macon-bibb jurisdiction_name: Macon-Bibb County place_fips: "1349008" county_fips: "13021" corpus_version: local-codes-macon-bibb-40e82b0dc7f2 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/cities/macon-bibb/code/~part-iii/~chapter-23/~article-iii.md previous: https://georgiacommons.org/cities/macon-bibb/code/23-37.md next: https://georgiacommons.org/cities/macon-bibb/code/23-39.md index: https://georgiacommons.org/cities/macon-bibb.md branch: code edition: As published by Municode, retrieved 2026-11-14 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:macon-bibb/code/23-38@2026-11-14-0d75964fb8 --- # Macon-Bibb County Code of Ordinances, Sec. 23-38. Compliance through Off-Site Stormwater Management Practices > As published by Municode, retrieved 2026-11-14 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part III - CODE OF ORDINANCES / Chapter 23 - STORMWATER MANAGEMENT / Article III - STORMWATER MANAGEMENT PLANS All stormwater management design plans shall include on-site green infrastructure and stormwater management practices, unless arrangements are made with the Authority to manage post-construction stormwater runoff in an off-site or regional stormwater management practice. The off-site or regional stormwater management practice must be located on property legally dedicated to that purpose, be designed and sized to meet the postconstruction stormwater management criteria presented in Section 4.0 of this ordinance, provide a level of stormwater quality and quantity control that is equal to or greater than that which would be provided by on-site green infrastructure and stormwater management practices and have an associated inspection and maintenance agreement and plan (Section 3.5). In addition, appropriate stormwater management practices shall be installed, where necessary, to protect properties and drainage channels that are located between the development site and the location of the off-site or regional stormwater management practice. To be eligible for compliance through the use of off-site stormwater management practices, the applicant must submit a stormwater management design plan to the Authority that shows the adequacy of the off-site or regional stormwater management practice and demonstrates, to the satisfaction of the Authority, that the off-site or regional stormwater management practice will not result in the following impacts: (1) Increased threat of flood damage or endangerment to public health or safety; (2) Deterioration of existing culverts, bridges, dams and other structures; (3) Accelerated streambank or streambed erosion or siltation; (4) Degradation of in-stream biological functions or habitat; or, (5) Water quality impairment in violation of state water quality standards and/or violation of any other state or federal regulations. For new projects using off-site stormwater management practices that received prior approval for its stormwater management plan, the previously approved plans must be submitted with the new project's plans. The proposed conditions may not exceed the impervious area or impact hydrologic conditions differently than the proposed conditions of the previously-approved plans to be eligible for compliance. If the previously-approved stormwater management plans are not available or proposed conditions differ from the prior plans, then a new engineering study will need to be submitted with necessary stormwater management plan modifications to meet stormwater management criteria of the current LDM. ## History (Ord. No. O-22-0016, § 3(Exh. C), 4-5-2022)