--- title: Macon-Bibb County Code of Ordinances, Sec. 23-40. Construction inspection collection: local-codes id: local-code:macon-bibb/code/23-40 cite_as: Macon-Bibb County, Ga., Code of Ordinances § 23-40 canonical_url: https://georgiacommons.org/cities/macon-bibb/code/23-40 md_url: https://georgiacommons.org/cities/macon-bibb/code/23-40.md text_url: https://georgiacommons.org/cities/macon-bibb/code/23-40/text source_url: https://library.municode.com/ga/macon-bibb_county/codes/code_of_ordinances date: 2026-11-14 status: active jurisdiction: consolidated:macon-bibb jurisdiction_name: Macon-Bibb County place_fips: "1349008" county_fips: "13021" corpus_version: local-codes-macon-bibb-40e82b0dc7f2 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/cities/macon-bibb/code/~part-iii/~chapter-23/~article-iii.md previous: https://georgiacommons.org/cities/macon-bibb/code/23-39.md next: https://georgiacommons.org/cities/macon-bibb/code/23-41.md index: https://georgiacommons.org/cities/macon-bibb.md branch: code edition: As published by Municode, retrieved 2026-11-14 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:macon-bibb/code/23-40@2026-11-14-a2f67880aa --- # Macon-Bibb County Code of Ordinances, Sec. 23-40. Construction inspection > As published by Municode, retrieved 2026-11-14 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part III - CODE OF ORDINANCES / Chapter 23 - STORMWATER MANAGEMENT / Article III - STORMWATER MANAGEMENT PLANS (a) Notice of construction commencement. The applicant must notify the Authority in advance before the commencement of construction. If any violations are found, the property owner shall be notified in writing of the nature of the violation and the required corrective actions. No added work shall proceed unless permitted by the Authority until any violations are corrected and all work previously completed has received approval by the Authority. (b) As-built plans. All applicants are required to submit actual "as-built" plans for any stormwater management practices located both on-site and off-site after final construction is completed in a format specified in the current LDM. The plan must show the final design specifications for all stormwater management facilities and must be certified by a professional engineer, landscape architect, or registered surveyor licensed in the state. A final inspection by the Authority is required before the release of any performance securities can occur. (c) Landscaping and stabilization requirements. All requirements of the Authority's soil erosion and sedimentation control ordinance for stabilizing the site during construction and after completion of final grading shall apply. ## History (Ord. No. O-22-0016, § 3(Exh. C), 4-5-2022)