The following factors should be assessed by the Committee when determining whether a Complete Streets design application is appropriate: (a) Whether there has been a collision involving a bicycle or pedestrian on the roadway in question within the last 5 years; (b) Existing annual average daily traffic ("AADT") and projected AADT as determined by the Travel Demand Model; (c) Whether the posted speed limit is 35 miles per hour or less; (d) The degree of current and potential bicycle or pedestrian use; (e) Whether a proposed facility adds connectivity for existing infrastructure or connects destinations; (f) Whether a proposed facility is identified in any official planning document that has been adopted by Macon-Bibb County; (g) Whether there is demonstrated community support for the proposed facility; (h) Whether the proposed facility is redundant or conflicting with other projects; (i) Whether funding can be identified for the proposed facility and its maintenance; (j) Whether the proposed facility would cause Level of Service to drop below LOS C; (k) Whether the proposed facility fits within existing rights of way, if an off-street facility is proposed; (l) Whether the proposed facility fits within the existing roadway, if an on-street facility is proposed; and (m) Priority in finding feasibility should be given to projects in neighborhoods identified as low-to-moderate income by the most recent census data.