Skip to content
Georgia Commons
Menu

Macon-Bibb County · Code of Ordinances

Part III - CODE OF ORDINANCES / Chapter 24 - STREETS AND SIDEWALKS / Article IV - EXCAVATIONS

Sec. 24-66. Duty to lower pipes.

About this text

  • As published by Municode, retrieved 2026-11-14
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Whenever excavations are to be made in any street or sidewalk for the purpose of curbing or laying sidewalks or improving or repairing such street or sidewalk, any property holder having gas or water pipes connecting the mains with his premises, or having sewer pipes or other pipes or obstructions of any kind for which the owner of the property may be responsible, shall lower the pipe or other obstructions. The Macon-Bibb County engineer shall serve the property owner with notice to lower the pipe or other obstruction within fifteen (15) days from the date of the notice. The notice shall state the depth of the excavation to be made. The notice may be served upon the owner, an agent or other person in charge of the property, abutting on, or in front of which the sidewalk is to be laid or the curb set. It shall be unlawful for any person to refuse to lower the pipe or other obstruction as set forth in this section.

History

The history line the source prints at the end of the section.

(Ord. No. O-15-0030, § 1, 7-21-2015)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:macon-bibb/code/24-66@2026-11-14-3fadb5916e

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.