(a) During the time occupied in making the excavation, removing earth and pavement and relaying such pavement, and from the time the excavation is begun until the completion of the relaying of the pavement, the applicant shall be liable for all damage that may be done to Macon-Bibb County property or to life, limb or property of any person. (b) When the work is completed, Macon-Bibb County or a person authorized by the Macon-Bibb County engineer, shall remove the waste material and clean up the street. Only such old paving material as shall be accepted by the Macon-Bibb County engineer shall be used in repairing and repaving the streets excavated.