Skip to content
Georgia Commons
Menu

Macon-Bibb County · Code of Ordinances

Part III - CODE OF ORDINANCES / Chapter 25 - SUBDIVISIONS / Article I - IN GENERAL

Sec. 25-11. Construction plans.

About this text

  • As published by Municode, retrieved 2026-11-14
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Four copies of all plans for streets, sanitary sewers, storm sewers, sidewalks, etc. and other required improvements showing the proposed plans, profiles and applicable cross sections of each shall be submitted to and approved by the engineer's office as being in conformity with these regulations prior to commencing construction of any new system. The plans shall be prepared from an actual engineering field or photogrammetric survey, and show along with all proposed new improvements all existing applicable improvements.

(b) The construction plans shall be prepared on a standard plan and profile sheets and shall show the items specified in the Local Subdivision Design Manual.

History

The history line the source prints at the end of the section.

(Ord. No. O-19-0065, § 1(Exh. B), 10-1-2019)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:macon-bibb/code/25-11@2026-11-14-86d97f4363

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.