--- title: Macon-Bibb County Code of Ordinances, Sec. 25-14. Postponement of public improvements; bond collection: local-codes id: local-code:macon-bibb/code/25-14 cite_as: Macon-Bibb County, Ga., Code of Ordinances ยง 25-14 canonical_url: https://georgiacommons.org/cities/macon-bibb/code/25-14 md_url: https://georgiacommons.org/cities/macon-bibb/code/25-14.md text_url: https://georgiacommons.org/cities/macon-bibb/code/25-14/text source_url: https://library.municode.com/ga/macon-bibb_county/codes/code_of_ordinances date: 2026-11-14 status: active jurisdiction: consolidated:macon-bibb jurisdiction_name: Macon-Bibb County place_fips: "1349008" county_fips: "13021" corpus_version: local-codes-macon-bibb-40e82b0dc7f2 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/cities/macon-bibb/code/~part-iii/~chapter-25/~article-i.md previous: https://georgiacommons.org/cities/macon-bibb/code/25-13.md next: https://georgiacommons.org/cities/macon-bibb/code/25-15.md index: https://georgiacommons.org/cities/macon-bibb.md branch: code edition: As published by Municode, retrieved 2026-11-14 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:macon-bibb/code/25-14@2026-11-14-e240c328f5 --- # Macon-Bibb County Code of Ordinances, Sec. 25-14. Postponement of public improvements; bond > As published by Municode, retrieved 2026-11-14 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part III - CODE OF ORDINANCES / Chapter 25 - SUBDIVISIONS / Article I - IN GENERAL (a) Developers who do not construct and/or install all required public improvements described in this chapter prior to final plat approval must post a performance bond payable to Macon-Bibb County with a corporate surety or other surety approved by the commission before such approval is given by the engineer. A cashier's check payable to Macon-Bibb County will be accepted in lieu of a bond, with the right of Macon-Bibb County to deposit the same in its treasury at interest. Macon-Bibb County will also accept a letter of credit issued by a local bank upon such terms and conditions as the engineer shall prescribe in order to permit the letter of credit to provide the same protection as a bond would have furnished. The amount of the bond, cashier's check or letter of credit shall be equal to 100 percent of the total estimated cost of the required public improvement. (b) In the event that the required improvements are made within the time period specified in the bond or letter of credit and found to be acceptable to the commission, the bond or letter of credit shall be considered null and void. In such case, the amount of the cashier's check, if accepted in lieu of bond, shall be refunded to the developer with any interest earned thereon. In the event the required improvements are not made within the period specified, the engineer shall immediately report such fact to the commission for appropriate action. All decisions regarding forfeiture of a bond or letter of credit or forfeiture of the right to the return of the amount of a cashier's check shall be made only by the commission. Performance bonds or cashier's checks will be promptly transmitted by the engineer to the clerk of the commission.