Macon-Bibb County · Code of Ordinances
Part III - CODE OF ORDINANCES / Chapter 25 - SUBDIVISIONS / Article I - IN GENERAL
Sec. 25-18. Detailed construction specifications.
About this text
- As published by Municode, retrieved 2026-11-14
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) Adopted. For the construction of roads, streets, and related appurtenances in Macon-Bibb County, the "Department of Transportation, State of Georgia, Standard Specifications for Construction of Roads and Bridges," latest edition as of the date of the plat approval, is hereby adopted as the official construction specifications of Macon-Bibb County.
Copies of the above specifications are available from the Georgia Department of Transportation.
(b) Description of terms. Whenever, in the Department of Transportation, State of Georgia "Specifications," the following terms are used, the intent will be understood as follows:
(1) Department means the engineer's office.
(2) Engineer means the engineer for Macon-Bibb County.
(3) Proposal form means the bid form.
(4) State means Macon-Bibb County.
(c) Material submittals. All material submittals called for in the construction specifications will be approved by the engineer or his authorized representative prior to incorporating into any part of the job. Submittals will be submitted by the developer or his authorized representative to the engineer's office.
(d) Testing. All testing will be performed at the expense of the developer. By a qualified testing laboratory approved by the engineer. The approved testing laboratory will submit copies of all test results to the engineer for his records. It will be the responsibility of the developer or his authorized representative to insure that all tests required are made. See the Local Subdivision Design Manual for testing requirements. Test locations will be designated by the engineer.
(e) Construction details. The standard construction details for the state department of transportation, as they exist from time to time, are hereby adopted as the official construction details to be exhibited on the construction plans. Copies of the above details are available from the Georgia Department of Transportation. The engineer may develop standard details to include in the Local Subdivision Design Manual as well.
History
(Ord. No. O-19-0065, § 1(Exh. B), 10-1-2019)
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.