Where a subdivision is traversed by a watercourse, drainageway, channel, or stream, there shall be provided a stormwater easement or drainage right-of-way conforming substantially with the lines of such watercourse, and such further width or construction, or both, as will be adequate for the purpose of drainage and maintenance, taking into account possible future development of higher land in the same drainage areas. The drainageway shall be piped when the engineer shall find that it is a hazard or that a continual maintenance problem might exist. The developer shall comply with all environmental requirements for permits required by state or federal agencies.