(a) Concrete curb and gutter will be required if the engineer shall find that soil conditions or topography are such that the flow of stormwater drainage would be impeded or cause excessive erosion. (b) Either the six-inch vertical or four-inch roll-over concrete curb and gutter with a minimum overall width of 24 inches shall be used.