--- title: Macon-Bibb County Code of Ordinances, Sec. 25-44. Utility systems collection: local-codes id: local-code:macon-bibb/code/25-44 cite_as: Macon-Bibb County, Ga., Code of Ordinances § 25-44 canonical_url: https://georgiacommons.org/cities/macon-bibb/code/25-44 md_url: https://georgiacommons.org/cities/macon-bibb/code/25-44.md text_url: https://georgiacommons.org/cities/macon-bibb/code/25-44/text source_url: https://library.municode.com/ga/macon-bibb_county/codes/code_of_ordinances date: 2026-11-14 status: active jurisdiction: consolidated:macon-bibb jurisdiction_name: Macon-Bibb County place_fips: "1349008" county_fips: "13021" corpus_version: local-codes-macon-bibb-40e82b0dc7f2 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/cities/macon-bibb/code/~part-iii/~chapter-25/~article-ii/~division-1.md previous: https://georgiacommons.org/cities/macon-bibb/code/25-43.md next: https://georgiacommons.org/cities/macon-bibb/code/25-45.md index: https://georgiacommons.org/cities/macon-bibb.md branch: code edition: As published by Municode, retrieved 2026-11-14 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:macon-bibb/code/25-44@2026-11-14-6b5b4a5db0 --- # Macon-Bibb County Code of Ordinances, Sec. 25-44. Utility systems > As published by Municode, retrieved 2026-11-14 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part III - CODE OF ORDINANCES / Chapter 25 - SUBDIVISIONS / Article II - DESIGN AND CONSTRUCTION STANDARDS / Division 1 - GENERALLY (a) It will be incumbent upon all licensed utility companies within the corporate limits of Macon-Bibb County to ensure that all utility systems which are to be placed underground are in place prior to placing base material and surface course by paving contractor. All developers will notify the utility companies in advance for work scheduling. (b) All utility trenches shall be compacted as specified in the Local Subdivision Design Manual. Compliance with the compaction and restoration provisions shall be the responsibility and at the expense of the utility company installing the system or the developer where the work is performed by the development company or its subcontractors. If excavations are made within the paved area of a street after completion of paving or within the limits of the street right-of-way after it has been graded, grassed or sodded, the company making the excavation shall, at its expense, restore the surface to its original condition and provide such compaction as will prevent settlement. At designated crossing points, utility systems shall install conduits, if there is to be a lag in utility construction. (c) In subdivisions where all utility systems are to be placed underground, there shall be included in the underground installations for electrical service the necessary circuitry to provide for street lights. ## History (Ord. No. O-19-0065, § 1(Exh. B), 10-1-2019)