Skip to content
Georgia Commons
Menu

Macon-Bibb County · Code of Ordinances

Part III - CODE OF ORDINANCES / Chapter 25 - SUBDIVISIONS / Article II - DESIGN AND CONSTRUCTION STANDARDS / Division 1 - GENERALLY

Sec. 25-48. Water distribution systems.

About this text

  • As published by Municode, retrieved 2026-11-14
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

All new water distribution systems to be located in a new subdivision will be designed and installed in accordance with specifications adopted by the Macon Water Authority. Approval of a water distribution system by the authority is required prior to submission of engineering construction drawings to the engineer's office. Evidence of approval is required. Water mains and laterals shall be compacted in accordance with the Local Subdivision Design Manual.

History

The history line the source prints at the end of the section.

(Ord. No. O-19-0065, § 1(Exh. B), 10-1-2019)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:macon-bibb/code/25-48@2026-11-14-788aa849d6

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Macon-Bibb County Code of Ordinances, Sec. 25-48. Water distribution systems | Georgia Commons