--- title: Macon-Bibb County Code of Ordinances, Sec. 29-10. Application to lay underground wires; permit required; access by MaconBibb County engineer collection: local-codes id: local-code:macon-bibb/code/29-10 cite_as: Macon-Bibb County, Ga., Code of Ordinances ยง 29-10 canonical_url: https://georgiacommons.org/cities/macon-bibb/code/29-10 md_url: https://georgiacommons.org/cities/macon-bibb/code/29-10.md text_url: https://georgiacommons.org/cities/macon-bibb/code/29-10/text source_url: https://library.municode.com/ga/macon-bibb_county/codes/code_of_ordinances date: 2026-11-14 status: active jurisdiction: consolidated:macon-bibb jurisdiction_name: Macon-Bibb County place_fips: "1349008" county_fips: "13021" corpus_version: local-codes-macon-bibb-40e82b0dc7f2 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/cities/macon-bibb/code/~part-iii/~chapter-29/~article-i.md previous: https://georgiacommons.org/cities/macon-bibb/code/29-9.md next: https://georgiacommons.org/cities/macon-bibb/code/29-11.md index: https://georgiacommons.org/cities/macon-bibb.md branch: code edition: As published by Municode, retrieved 2026-11-14 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:macon-bibb/code/29-10@2026-11-14-10fbc716ae --- # Macon-Bibb County Code of Ordinances, Sec. 29-10. Application to lay underground wires; permit required; access by MaconBibb County engineer > As published by Municode, retrieved 2026-11-14 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part III - CODE OF ORDINANCES / Chapter 29 - UTILITIES AND FRANCHISES / Article I - IN GENERAL Prior to making any opening in any street, for the laying of conduits, tubes, or pipes for electrical conductors, cables, or wires, the person desiring to lay the same shall make application to the Macon-Bibb County engineer, in writing, and shall file plans and specifica-tions showing the location, the route, and the length of the proposed conduits, pipes, and tubes. The engineer shall have authority to issue the necessary permit for the opening of the street, as set forth in the application and plans. The opening of the street, without a permit having been first obtained, shall forfeit the right of any person to use or occupy the street. The work of laying any underground conduits, tubes, pipes, electrical conductors, cables, and wires shall be under the direction and approval of the Macon-Bibb County engineer, who shall at all times have free and unobstructed access to the conduits, tubes, pipes, electrical conductors, or cables, for the purpose of inspecting the same, or making connections therewith for wires or conductors in use or to be used by Macon-Bibb County.