--- title: Macon-Bibb County Code of Ordinances, Sec. 29-175. Conditions and regulations collection: local-codes id: local-code:macon-bibb/code/29-175 cite_as: Macon-Bibb County, Ga., Code of Ordinances ยง 29-175 canonical_url: https://georgiacommons.org/cities/macon-bibb/code/29-175 md_url: https://georgiacommons.org/cities/macon-bibb/code/29-175.md text_url: https://georgiacommons.org/cities/macon-bibb/code/29-175/text source_url: https://library.municode.com/ga/macon-bibb_county/codes/code_of_ordinances date: 2026-11-14 status: active jurisdiction: consolidated:macon-bibb jurisdiction_name: Macon-Bibb County place_fips: "1349008" county_fips: "13021" corpus_version: local-codes-macon-bibb-40e82b0dc7f2 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/cities/macon-bibb/code/~part-iii/~chapter-29/~article-ix.md previous: https://georgiacommons.org/cities/macon-bibb/code/29-174.md next: https://georgiacommons.org/cities/macon-bibb/code/29-176.md index: https://georgiacommons.org/cities/macon-bibb.md branch: code edition: As published by Municode, retrieved 2026-11-14 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:macon-bibb/code/29-175@2026-11-14-77734e48eb --- # Macon-Bibb County Code of Ordinances, Sec. 29-175. Conditions and regulations > As published by Municode, retrieved 2026-11-14 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part III - CODE OF ORDINANCES / Chapter 29 - UTILITIES AND FRANCHISES / Article IX - WATER SYSTEM All permits shall be issued and all pipe and conduits shall be installed subject to and in accord with the following conditions and regulations: (1) No pipe nor conduit shall be installed less than 30 inches deep. (2) No excavation shall be made under the pavement larger than the hole in the pavement. (3) The excavation shall be properly backfilled and the backfill material thoroughly tamped into place, the material being left slightly higher than the pavement to allow for settlement, and should settlement occur, the party making the excavation shall keep same filled up with satisfactory material until pavement is repaired. (4) Adequate barricades, proper signage, and lights shall be provided by the party making the excavation at all times during construction and until pavement is repaired. (5) Upon completion of construction and the proper filling of the excavation the contractor shall notify the Macon-Bibb County engineer that the work is complete and that the pavement may be repaired. (6) After, in the opinion of the Macon-Bibb County engineer, sufficient time has elapsed for the backfill to properly settle, the pavement shall be repaired by Macon-Bibb County forces. (7) No parties other than Macon-Bibb County forces shall repair or replace any pavement without the express consent of the Macon-Bibb County engineer. (8) No pipe or conduit shall be laid at such a grade or in such a manner as to disturb any existing cross-drain, culvert, pipe, storm sewer, sanitary sewer, side-drain pipe or other existing pipe, nor less than four inches above the top or below the bottom of any existing pipe or culvert.