Skip to content
Georgia Commons
Menu

Macon-Bibb County · Code of Ordinances

Part III - CODE OF ORDINANCES / Chapter 29 - UTILITIES AND FRANCHISES / Article XI - WIRELESS FACILITIES AND ANTENNAS / Division 3 - PERMITS

Sec. 29-213. Permits required; when; pre-application meeting.

About this text

  • As published by Municode, retrieved 2026-11-14
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

a. A permit is required to collocate a small wireless facility in the public right of way or to install, modify, or replace a pole or a decorative pole in the public right of way. A permit is not required to perform the activities described in O.C.G.A. §§ 36-66C-6(e) or (f).

b. All applicants for a permit under this Article shall be required to attend a preapplication meeting with the Macon-Bibb County Department of Engineering at least 30 days before submitting an application, as provided in O.C.G.A. § 36-66C-3(b).

History

The history line the source prints at the end of the section.

(Ord. No. O-19-0062, § 1, 9-17-2019)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:macon-bibb/code/29-213@2026-11-14-24338d2943

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.