Macon-Bibb County · Code of Ordinances
Part III - CODE OF ORDINANCES / Chapter 29 - UTILITIES AND FRANCHISES / Article XI - WIRELESS FACILITIES AND ANTENNAS / Division 3 - PERMITS
Sec. 29-213. Permits required; when; pre-application meeting.
About this text
- As published by Municode, retrieved 2026-11-14
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
a. A permit is required to collocate a small wireless facility in the public right of way or to install, modify, or replace a pole or a decorative pole in the public right of way. A permit is not required to perform the activities described in O.C.G.A. §§ 36-66C-6(e) or (f).
b. All applicants for a permit under this Article shall be required to attend a preapplication meeting with the Macon-Bibb County Department of Engineering at least 30 days before submitting an application, as provided in O.C.G.A. § 36-66C-3(b).
History
(Ord. No. O-19-0062, § 1, 9-17-2019)
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.