All persons to whom permission may be granted for renewing or laying underground conduits, tubes, or pipes for electrical conductors, cables, or wires, shall conform to the following requirements: (1) No streets shall be broken or occupied by any person for the purpose of laying down conduits, tubes, or pipes for electrical conductors, cables, or wires, except by written permission of the engineer. (2) During the construction or laying down of the underground conduits, tubes, or pipes, conductors, cables, or wires, no streets shall be opened or the pavement broken for a greater distance than 500 feet at any one opening, and no section of the 500 feet shall be kept open for a longer period than ten days, and the opening shall not be of greater width than four feet except where permitted by the Macon-Bibb County engineer. (3) As the work progresses the pavement shall be properly relaid and the street put in good condition.