Georgia Commons

Official Code of Georgia Annotated

Title 31. HEALTH · Chapter 13. RADIATION CONTROL

31-13-7. Permits for disposal of radioactive waste; bonding of permittees; penalty for improperly abandoning a site or facility.

Active

Current through: Including Acts of the 2025 Session of the General Assembly of Georgia.

  1. (a)

    No person shall construct or operate a site or other facility for the concentration, storage, or burial of radioactive waste without first securing a permit for such construction or operation from the director of the Environmental Protection Division of the Department of Natural Resources. The director, under the conditions he prescribes, may require the submission of such plans, specifications, and other information as he deems relevant in connection with the issuance of such permit. The director may issue a permit for the construction or operation of such a site or other facility upon a determination that the construction or operation would be consistent with the purposes and stated policy of this chapter. Any permit which may be issued by the director shall specify the conditions under which the site or facility shall be operated. The director, in specifying such conditions, shall have the power and authority to require a permittee to establish and maintain records; to make reports; to install, maintain, and use monitoring equipment or methods including, but not limited to, biological monitoring methods or emission and ambient monitoring devices; to sample any emission or discharge in accordance with such methods, at such locations, at such intervals, and in such manner as the director shall prescribe; and to provide such other information as he may reasonably require. Any permit issued shall be subject to periodic review; and the director may revoke or modify any permit if the holder fails to comply with any conditions thereof. The director is authorized to adopt, modify, repeal, and promulgate, after due notice and public hearing held in accordance with and established pursuant to Chapter 13 of Title 50, the “Georgia Administrative Procedure Act,” rules and regulations not inconsistent with this Code section, for purposes of administering this Code section.#

  2. (b)

    The director may require the posting of a bond by the proposed permittee or operator, payable to the state, as a condition of any permit, in order to assure the availability of funds to the state in the event of abandonment, insolvency, or other inability of a permittee to meet the requirements of the Environmental Protection Division of the Department of Natural Resources for the safe collection and disposition of sources of ionizing radiation in the event of an accident, discontinuance of operation, or any circumstance which results in a potential radiation hazard at a site or facility for the concentration, storage, or burial of radioactive waste, which site is occupied by the permittee or was formerly under its possession, ownership, or control. The Environmental Protection Division of the Department of Natural Resources is authorized to establish, by rule or regulation, the bonding requirements of permittees by range of monetary amounts. In establishing such requirements, the director of the Environmental Protection Division shall give due consideration to the probable extent of contamination, the amount of possible property damage, the costs of removal and disposal of sources of radiation used by the permittee, and the costs of reclamation of the property in the event of abandonment, insolvency, or other inability of the permittee to perform such services to the satisfaction of the director. The director shall have authority upon finding that conditions under this Code section have not been met or when he determines that an imminent hazard to the public health and welfare exists to require forfeiture of bond and use the money therefrom to take any action deemed necessary to protect the public health and welfare. A permittee who abandons a site or facility without taking the required actions to meet the requirements of the director of the Environmental Protection Division of the Department of Natural Resources shall be guilty of a misdemeanor. Any bonding or financial protection requirements established by the director pursuant to this Code section shall not apply to the state, or any agency of the state, or to the storage of spent fuel possessed under 10 CFR Part 50 or Part 70, which fuel was generated at an electric generating utilization facility and which is stored at such utilization facility in facilities licensed under 10 CFR Part 50 or at another such in-state utilization facility in facilities licensed under 10 CFR Part 50.#

The notes below are printed with the section but are not enacted law (O.C.G.A. § 1-1-1(c)). They are shown apart from the text.

History

Code 1933, § 88-1306.1, enacted by Ga. L. 1968, p. 1152, § 1; Ga. L. 1976, p. 1567, § 6; Ga. L. 1979, p. 1059, § 2; Ga. L. 1985, p. 149, § 31; Ga. L. 1990, p. 711, § 1.

Cross references

Hazardous waste management, § 12-8-60 et seq.

Read the official page (the state's PDF, opened at the page this text was read from).

Current through: Including Acts of the 2025 Session of the General Assembly of Georgia.

Text read from t31-(v23)-2025-pdf.pdf, Volume V23, 2025 edition, pages 799 to 800; merge action: bound only; file SHA-256 ba5a57f85d04.

Ask about this section

The answer is drawn from this section and, when they fit, the other sections of its chapter. It quotes the text and names the section for each claim. Not legal advice.

Answers come from this document. Not legal advice.