Title 32. HIGHWAYS, BRIDGES, AND FERRIES · Chapter 2. DEPARTMENT OF TRANSPORTATION · Article 4. EXERCISE OF POWER TO CONTRACT GENERALLY
32-2-62. Advertising of nonnegotiated construction contracts; approval of negotiated construction contracts; factors to be considered by board for priority of projects.
Current through: Including Acts of the 2025 Regular Session of the General Assembly.
The advertising of all nonnegotiated department construction contracts shall have the prior approval of the board. When the board is not in session, the commissioner may approve negotiated construction contracts. In determining public roads most in need of work and also the type, class, width, location, and order of priority of each project, the board shall take into consideration such factors as the use of the public road in question; the present need and anticipated development of the area traversed by it; whether or not it is a school bus or mail route; and its use for agricultural or industrial purposes. The board shall also take into consideration the information disclosed by the records required by Code Section 32-4-2 to be maintained by the department.
History
Code 1933, § 95A-803, enacted by Ga. L. 1973, p. 947, § 1.
Read the official page (the state's PDF, opened at the page this text was read from).
Current through: Including Acts of the 2025 Regular Session of the General Assembly.
Text read from t32-(v23a)-2019-pdf.pdf, Volume V23A, 2019 edition, page 66; merge action: carried; file SHA-256 04a286a38b4e.
Ask about this section
The answer is drawn from this section and, when they fit, the other sections of its chapter. It quotes the text and names the section for each claim. Not legal advice.