Georgia Commons

Official Code of Georgia Annotated

Title 36. LOCAL GOVERNMENT · Chapter 66C. STREAMLINING WIRELESS FACILITIES AND ANTENNAS

36-66C-11. Alternate locations; certification.

Active

Current through: Including Acts of the 2025 Session of the General Assembly of Georgia.

  1. For applications for new poles in the right of way in areas zoned for residential use, the authority may propose an alternate location in the right of way within 100 feet of the location set forth in the application, and the wireless provider shall use the authority’s proposed alternate location unless the location imposes technical limits or significant additional costs. The wireless provider shall certify that it has made such a determination in good faith, based on the assessment of a licensed engineer, and it shall provide a written summary of the basis for such determination.

The notes below are printed with the section but are not enacted law (O.C.G.A. § 1-1-1(c)). They are shown apart from the text.

History

Code 1981, § 36-66C-11, enacted by Ga. L. 2019, p. 236, § 1/SB 66.

Read the official page (the state's PDF, opened at the page this text was read from).

Current through: Including Acts of the 2025 Session of the General Assembly of Georgia.

Text read from t36-ch60-92-(v27a)-2025-pdf.pdf, Volume V27A, 2025 edition, page 237; merge action: bound only; file SHA-256 5150ee8c60f7.

Ask about this section

The answer is drawn from this section and, when they fit, the other sections of its chapter. It quotes the text and names the section for each claim. Not legal advice.

Answers come from this document. Not legal advice.

O.C.G.A. § 36-66C-11. Alternate locations; certification. | Georgia Commons