Acworth · Zoning Ordinance
Appendix B - ZONING ORDINANCE
73-14.10. Tree Protection and Replacement Plans.
About this text
- As published by Municode, current through 2026-02-09
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
A. Tree Protection Plan—Required documents. A Tree Protection Plan is a detailed plan designed to protect and preserve trees before, during and for a period of two (2) years after construction.
This Protection Plan is a separate drawing that must be submitted at the same time as the Tree Survey Plan in order to qualify for a Tree Removal Permit. The Plan shall list the following specifications:
1. The identity of the tract of land upon which tree(s) sought to be removed are located.
2. The name, address and phone number of the owner of the land and the name, address and phone number of any tenant of the property.
3. The type, location and size as measured at the diameter breast height of the tree(s) constituting those to be protected. Only trees designated on the Tree Protection Plan will be counted toward density requirements.
4. Locations of all specimen trees and their critical root zones (CRZ's). Indicate those specimen trees proposed for removal or for preservation. Removal of specimen trees is subject to approval. Any specimen tree proposed for removal is to be identified in terms of exact location, size, and species.
5. All tree protection zones, natural areas, landscaped areas, buffers, and areas of re-vegetation. Include detailed locations and specifications for active and/or passive tree protection measures. Methods of tree protection should be indicated for all tree protection zones, including tree fencing, erosion control, retaining walls, tunneling for utilities, aeration systems, transplanting, staking, signage, etc.
6. Limits of clearing and land disturbance such as grading, trenching, etc., where these disturbances may affect tree protection zones.
7. The locations of all existing and proposed utility lines or easements. Include the location for any boring sites for underground utilities.
8. Indication of staging areas for parking, material storage, concrete washout, and other areas where tree protection may be affected.
9. A delineation of tree save areas in which trees have been inventoried for minimum site DBH calculation.
10. Calculations showing compliance with the required minimum site DBH density using existing trees, replacement/recompense trees, and/or alternative compliance methods.
Site density compliance shall be demonstrated on both the Tree Protection and the Tree Replacement plans. Existing trees or stands of trees used in determining the minimum site DBH density requirement shall be indicated on the drawings.
11. Site area (roads, utility lines, detention ponds, etc.).
12. The locations of existing and proposed structures, paving, driveways, land disturbance, cut and fill areas, detention areas, etc.
13. Phase lines and/or limits of construction.
14. Location and details for all permanent tree protection measures (tree wells, aeration systems, permeable paving, retaining walls, bollards, etc.).
15. Additional information as required on a case-by-case basis or as requested.
B. Tree Replacement Plan—Standards and vegetation.
1. The last part of the Tree Removal Permit is the Tree Replacement Plan. This plan may be included as a part of the Tree Protection Plan or may be submitted as a separate drawing.
The Tree Replacement Plan includes the planting schedules along with proposed tree names (botanical and common), quantity, size, spacing and any special planting notes.
Unless otherwise approved, all trees selected for replanting must be in accordance with
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.