Skip to content
Georgia Commons
Menu

Acworth · Zoning Ordinance

Appendix B - ZONING ORDINANCE

73-14.6. Tree Replacement Standards.

About this text

  • As published by Municode, current through 2026-02-09
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

A. The replacement of trees shall occur within the required yards, buffers, open space, parking lots, and landscape areas, as specified in this Zoning Ordinance. The following standards for replacement will be used to evaluate proposed tree planting plans:

1. Existing tree coverage, size, and type;

2. Number of trees to be removed from the lot or parcel;

3. Area to be covered with structures, parking, and driveways;

4. Grading plan and drainage requirements; and,

5. Character of the site and its environs.

B. Replacement trees shall be ecologically compatible with the intended growing site, contribute to the diversity of the urban forest, and add to the aesthetic quality of the City.

1. The spacing of replacement trees shall be compatible with spatial site limitations with responsible consideration towards species sizes when mature. Typical spacing for overstory/street trees is forty (40) feet on center, with no overstory tree being planted less than twenty-five (25) feet on center from any other tree. Spacing of understory trees and/or trees in parking lots shall be subject to approval of the City and within accepted horticultural standards.

2. In the event that existing overhead power lines prohibit the planting of required overstory trees, an appropriate understory tree species may be selected and approved for required inches according to accepted horticultural standards and as approved by the impacted utility.

C. Trees selected for planting may be a species from the recommended tree species list. Use of a species not shown on these lists is subject to approval, according to accepted horticultural standards.

D. Planting of replacement trees within utility, storm drainage, or sanitary sewer easements is not acceptable, and no credit will be allowed toward the required inches per acre. City staff shall determine whether or not the applicant will be required to install root barriers to prevent future conflicts for trees planted directly adjacent to proposed easements or utility locations.

E. Trees and plants selected for planting must meet the minimum requirements as provided in the "American Standard for Nursery Stock" (ANSI Standards latest edition).

F. Each development site (parcel) shall contain trees of sufficient number, size, and type to achieve the minimum required tree density, which is determined according to the size of the parcel and is intended to be consistent across uses and underlying zoning categories. Total replacement units shall be gathered by using as diverse a palette of species of trees as possible.

However, a minimum of sixty (60) percent of the total replacement units required for any parcel shall be achieved in the form of overstory trees. When fewer than ten (10) trees are shown to be planted on a project, one (1) genus may be specified. When ten (10) to fifty (50) trees are shown, a minimum of three (3) genus of trees are required. When more than fifty (50) trees are shown, a minimum of five (5) genus of trees are required.

G. When ten (10) or more trees are to be planted:

1. No single genus shall represent more than thirty (30) percent of the required inches per acre.

2. Native vegetation shall be used to satisfy the replacement requirements of this chapter to the greatest practical extent.

H. Transitional Buffer planting standards are as follows:

1. An opaque buffer is a designated area along a property line that is required to be planted for the purpose of screening. Buffers may be required as a condition of zoning or in areas where incompatible land uses exist (i.e., commercial adjacent to residential).

2. The opaque buffer shall consist of evergreen plant materials that must form an eighty (70) percent visual barrier within three (3) years and a one hundred (100) percent visual barrier within five (5) years. Trees must be minimum five (5) feet height at installation, and shrubs must be minimum 30-inch height at installation.

a. Existing buffer to remain undisturbed: Sparsely vegetated or previously disturbed portions of this undisturbed, existing buffer must be replanted to comply with the definition above.

b. Buffer width twenty (20) feet or less: This buffer shall consist of a minimum of one (1) row of evergreen trees and one (1) row of evergreen shrubs.

c. Buffer width twenty-one (21) to thirty-five (35) feet: This buffer shall consist of a minimum of two (2) rows of evergreen trees and one (1) row of evergreen shrubs.

d. Buffer width greater than thirty-five (35) feet: This buffer design shall be subject to approval.

3. Evergreen trees planted within buffer areas may be counted for inch credit toward the minimum tree replacement requirements. For planted evergreen trees, the following conversions shall apply:

Table 7.3.6.H.3.-Planted Evergreen Conversion Evergreen Tree Inches: Evergreen Tree Sold by Height:

2 inches 6 feet minimum 3 inches 8 feet minimum 4 inches 12 feet minimum 5 inches 16 feet minimum 6 inches 18 feet minimum

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:acworth/zoning/73-14.6@2026-02-09-e0edd79757

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Acworth Zoning Ordinance, 73-14.6. Tree Replacement Standards | Georgia Commons