A. If any uncertainty exists with respect to the intended boundaries as shown on the Zoning Map, the Development Director, as the Zoning Official, is authorized to interpret the Zoning Map. B. Where uncertainty exists as to the boundaries of any district shown on the Zoning Map, the following shall apply: 1. Where possible, a rezoning file shall be used for delineating zoning boundaries. Such records shall have precedence over information otherwise contained on maps. 2. Where a zoning district boundary line divides a lot, each portion shall be governed by the zoning district that each portion is classified. 3. Where designation of a boundary line of the Zoning Map coincides with the location of a roadway, lane/alley, waterway or right-of-way, the center of the roadway, lane, waterway, or right-of-way shall be construed to be the boundary of such district. 4. Where the boundaries do not coincide with the location of roadways, lanes, waterways, or rights-of-way but do coincide with lot lines, such lot lines shall be construed to be the boundary of such district. C. When it is alleged that there is an error of interpretation by the Development Director, the applicant may appeal the decision as set forth in Section 73-11.11 Appeals.