Skip to content
Georgia Commons
Menu

Acworth · Zoning Ordinance

Appendix B - ZONING ORDINANCE / 73-8 - SITE DEVELOPMENT

73-8.9.1. Site Plan Approval.

About this text

  • As published by Municode, current through 2026-02-09
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

A. Commercial developments and some residential developments, such as apartment complexes require Site Plan approval as a function of the permit review process. Should the application not have had a prior review process by the Mayor and Board of Aldermen (e.g.: variance, rezoning, etc.), the site plan shall be reviewed by the Mayor and Board of Aldermen. Site plans are necessary for any change of use, new construction, or exterior alteration requiring a building permit of any building whether or not Board review is required.

B. Accompanying the site plan shall be conceptual architectural building façade elevations showing proposed materials, height, and colors. The approval here is of the site plan, not the particular use. All commercial and Industrial buildings façade's (front, sides and rear) shall be composed of primarily (60% of greater) of masonry (brick, stone, architectural split faced block only) with accents of hard coast stucco (EFIS), glass, fabric, (for awnings only), and metal (only for awnings, window frames and accent molding details). Any alternate design shall be reviewed and approved by the Mayor and Board of Aldermen with a recommendation from the Planning and Zoning Commission.

C. All decisions shall be based on site information only.

D. In order to meet the standards of this ordinance, an application may be approved, denied, or approved with conditions. Note: these standards do not supersede any other development requirements including, but not limited to, soil erosion approval, engineering review and detention requirements, subdivision platting review, and building plan review.

E. Site plan decision shall be based on demonstration of compliance with the requirements of the City's Code of Ordinances.

F. Once all City standards have been found to be in compliance, the development may be issued applicable permits.

G. If a permit has not been obtained within 12 months of an approved plan, said approval shall be deemed void and the project shall be resubmitted and reviewed by City staff under the most current regulations.

H. If a permit has been issued and a development remains for more than six (6) months with no activity, the permit shall be revoked and will require to be resubmitted for review by City staff under the most current regulations.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:acworth/zoning/73-8.9.1@2026-02-09-996607bdcf

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Acworth Zoning Ordinance, 73-8.9.1. Site Plan Approval | Georgia Commons