--- title: Alto Zoning Ordinance, Section 2201. Minimum setback and buffer requirements by zoning district collection: local-codes id: local-code:alto/zoning/2201 cite_as: Alto, Ga., Zoning Ordinance § 2201 canonical_url: https://georgiacommons.org/code/local/alto/zoning/2201 md_url: https://georgiacommons.org/code/local/alto/zoning/2201.md text_url: https://georgiacommons.org/code/local/alto/zoning/2201/text source_url: https://library.municode.com/ga/alto date: 2025-08-25 status: active jurisdiction: city:alto jurisdiction_name: Alto place_fips: "1301948" corpus_version: local-codes-alto-1c99834085d5 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/alto/zoning/~appendix-a/~article-xxii.md previous: https://georgiacommons.org/code/local/alto/zoning/2111.md next: https://georgiacommons.org/code/local/alto/zoning/2202.md index: https://georgiacommons.org/code/local/alto.md branch: zoning edition: As published by Municode, current through 2025-08-25 edition_date_kind: current_through source_publisher: Municode version_id: local-code:alto/zoning/2201@2025-08-25-527a9862c9 --- # Alto Zoning Ordinance, Section 2201. Minimum setback and buffer requirements by zoning district > As published by Municode, current through 2025-08-25 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A / Article XXII - MINIMUM DIMENSIONAL REQUIREMENTS PRINCIPAL BUILDING SETBACKS (feet) DISTRICT Units Per Acre EXTERIOR PERIMETER BUFFER PER DEVELOPMENT FRONT, ARTERIAL OR COLLECTOR STREETS FRONT, OTHER STREETS SIDE REAR R-I 35 25 15 25 R-II 35 25 15 25 R-III 35 25 15 25 R-IV 40 25 15 25 MHP ** ** ** ** NS 20 35 (A) 20 15 (A) 20 (A) HB 20 35 (B) 20 15 (B) 20 (B) CB 20 35 (A) 20 15 (A) 20 (A) CBD 20 10 (B) 10 5 (B) 20 (B) O-P 20 35 (A) 20 15 (A) 20 (A) M-I 20 35 (B) 20 15 (B) 20 (B) M-II 30 35 (C) 20 15 (C) 20 (C) A 100 80 25 35 PDD 35 45 18 12* 18* ** See Article XI, Section 1103 and 1104. Measurements for all setbacks are taken beginning from the end of the right-of-way. NOTE: Additional setbacks may be required for specified uses as provided in permitted uses sections of particular zoning districts or as to special uses granted by permit. (A) When development in this district abuts an A, R-I, R-II, or R-IV zoning district boundary, a vegetative buffer with a minimum width of five (5) feet and six (6) feet in height shall be provided along the entire property line abutting said zoning district. (B) When development in this district abuts an A, R-I, R-II, or R-IV zoning district boundary, a vegetative buffer with a minimum width of five (5) feet and six (6) feet in height shall be provided along the entire property line abutting said district. A five (5) foot vegetative wide buffer shall be required when this district abuts an R-3, MHP or O-P zoning district. (C) When development within this district abuts an A, R-I, R-II or R-IV zoning district boundary, a vegetative buffer with a minimum width of twenty-five (25) feet shall be provide along the entire property line abutting said zoning district. A twenty (20) foot wide vegetative buffer shall be required when this district abuts an R-3, MHP or O-P zoning district. How many square feet in an acre? There are 43,560 square feet in one acre. To determine the acreage size of your lot, divide the total square footage by 43,560. For example, a lot is 110 feet wide by 115 deep. • 110 x 115 = 12,650 square feet • 12,650 ÷ 43,560 = 0.29 acre If you have 110.25 acres: • 110.25 x 43,560 = 4,802, 490 square feet