Aragon · Zoning Ordinance
Appendix B - SUBDIVISIONS / Article III - PROCEDURE FOR PLAT APPROVAL (NONEXEMPT LAND DIVISIONS)
Sec. 3.4. Requirements.
About this text
- As published by Municode, current through 2019-03-26
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
The preliminary plat shall meet the minimum standards of design as set forth in these regulations and as set forth in the Georgia Plat Act and shall include the following information:
(a) General.
(1) Proposed name of subdivision (not necessary in case of a land division).
(2) Name and address of person to be notified of action.
(3) Graphic scale, north point and date. The north point shall be identified as magnetic, true, or grid north.
(4) Location sketch map showing the relationship of the subdivision or land division to the surrounding area.
(5) Acreage to be subdivided.
(6) The subdivider or developer shall submit a plat of such subdivider's entire tract even though such subdivider's present plans call for the actual development of only a small part of the property.
(7) The plat shall be drawn to a scale of not less than one inch equals 100 feet.
(b) Existing conditions.
(1) Topography by contours at vertical intervals of not more than five feet with topographic survey based on a field survey or an aerial survey.
(2) Deed record names of adjoining property owners or subdivisions.
(3) In case of resubdivision, a copy of existing plat with proposed resubdivision superimposed thereon.
(4) Location of streams, lakes, swamps, and land subject to flood as determined from past history of flooding or hydraulic engineering calculations of existing conditions and the 100-year floodplain shall be shown.
(5) Location of existing adjoining property lines and buildings on the property to be subdivided.
(6) Location and right-of-way of streets, roads, railroads, and utility lines on or adjacent to the property to be subdivided, specifying whether utility lines are in easements or rightof-way and showing location of towers.
(7) Size and location of existing sewers, water mains, drains, culverts, fire hydrants or other underground facilities within the tract or within the right-of-way of streets or roads adjoining the tract. Grades and inverts elevations of sewers shall be shown.
(c) Proposed conditions.
(1) Layout of streets, roads, alleys, public crosswalks, with widths, road names or designations, grades and cross sections.
(2) Profile of proposed streets showing natural and finished grades.
(3) Layout of all lots, including building setback lines, scaled dimensions on lots, utility easements with width and use.
(4) Number of lots and average size of lots proposed.
(5) Proposed unit division or stage development, if any, as proposed by the subdivider or developer.
(6) Preliminary plan of sanitary sewers (if applicable) with grade, pipe size, and points of discharge or percolation tests as specified by the health department and DNR-EPD regulations.
(7) Preliminary plan of storm sewer system with grade, pipe sizes and location of outlet.
(8) Preliminary plan of water supply system (if applicable) with pipe sizes and location of hydrants, valves, appurtenances, and other requirements specified by the water entity and
DNR-EPD.
(9) An underground utility cross section showing the required utility corridors shall be provided by the commissioner's office. Actual underground utility placement shall be made in accordance with this cross section.
(10) Designation of all land to be reserved or dedicated for public use.
(11) Soil erosion and sediment control plan.
(12) Certification by the designer that stormwater runoff as a result of this development will not be increased above initial stormwater runoff before development for the two-, five-, ten-, 25-, 50-, and 100-year storm events.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.