Aragon · Zoning Ordinance
Appendix B - SUBDIVISIONS / Article VI - REQUIRED IMPROVEMENTS
Sec. 6.3. Natural gas.
About this text
- As published by Municode, current through 2019-03-26
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
When gas lines are located in a street right-of-way and it will be necessary to cut into the street surface to serve the abutting lots, a connection shall be stubbed out to the property line to serve each lot prior to surfacing the street.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.